S-34.1, r. 2 - Regulation respecting petroleum exploration, production and storage on land

Full text
128. The authorization holder must, at least 24 hours before, notify the Minister of the rig release and, in case of a temporary interruption, the holder must also notify the Minister as soon as possible within the same period of the resumption of the work.
O.C. 1252-2018, s. 128.
In force: 2018-09-20
128. The authorization holder must, at least 24 hours before, notify the Minister of the rig release and, in case of a temporary interruption, the holder must also notify the Minister as soon as possible within the same period of the resumption of the work.
O.C. 1252-2018, s. 128.